SkyRiver Resort and Casino

About This Project

The $250M SkyRiver Resort and Casino project consisted of the first phase of casino buildout and site work of an eventual $500M casino and hotel. Contracted to the GC/CM, AECOM Tishman Yates, a Joint Venture, CriticalArc’s scope included but was not limited to commissioning services of the Central plant (water-cooled chillers, boilers), domestic hot water, HVAC, lighting control, irrigation, and low voltage systems in accordance with Title 24/CALGreen requirements. The project was scheduled for 1 year and was completed in 2022.

Project Details

Client: AECOM Tishman Yates, a Joint Venture
Project: SkyRiver Resort and Casino
Location: Elk Grove, CA
Sq. Ft.: 100K
Construction Volume: $250M