Image Credit: https://flysmf.gov/smforward
Aviation, Public

SMF – Pedestrian Walkway

About This Project

As part of the SMForward program, Sacramento International Airport is constructing an 88ksf elevated walkway, extending from Terminal B to Concourse B. This walkway is intended to serve as an alternative method of navigation when the current Automated People Mover is offline. The project began in late 2024 and is expected to be completed in 2027. CriticalArc has been contracted by Parsons, the Construction Management and Inspections Team, to provide Title 24 building commissioning services.

Project Details

Client: Parsons-Vanir SMF JV
Project: Pedestrian Walkway
Location: Sacramento, CA
Sq. Ft.: 88k
Construction Volume: $102M