About This Project
Due to increased electrification demand at LaGuardia Airport (LGA), 164 new eGSE charging ports are being installed in the airside and baggage areas. Additionally, 86 existing ports will be upgraded to tie into the new management system. CriticalArc has been tasked with prefunctional verification and functional performance testing of all charging ports. The project is $22.1M and spans 2026 – 2027.
Project Details
Client: Conrac Solutions
Project: LGA Terminal B Electric Ground Support Equipment Charging Infrastructure
Location: East Elmhurst, NY
Sq. Ft.: N/A
Construction Volume: $22M